Skip to content

Past Projects

Good Grind

INDUSTRIAL ALLY’S LASER SCANNING, 3D MODELING, AND DETAIL ENGINEERING SUPPORTED THE SMOOTH AND TIMELY INSTALLATION OF A NEW CEMENT GRINDING CIRCUIT. Our client has successfully completed the commissioning of a ...
Read More

Just the Right Blend

Industrial Ally has completed all (mechanical, structural, electrical) detail engineering associated with a series of new chemical processing facilities located in California, Florida, and Texas.  The new facilities are a ...
Read More

Ductwork Design

The analysis and design of large process ductwork that operates under significant temperature ranges requires experience and expertise. In addition to the platework design (layout and material specifications), placement and ...
Read More

Supporting a Safe Work Environment

Our structural team supports safe facility operations by performing on-site structural inspection services.  Since the beginning of this year we have executed over a half dozen site visits to assess ...
Read More

Increasing Uptime

We have just wrapped up a design project to eliminate a client’s raw mill feed chute plugging issue. Our client’s VRM inlet chute is fed by two conveyors (limestone and ...
Read More

Blended Cement

Industrial Ally has recently completed a feasibility study for a client considering the addition of a system to blend slag and/or OPC into its existing production line. Three options were ...
Read More

A Matter of Support

Industrial Ally has just completed an interesting and challenging structural engineering project that will allow our client to remain in operation while their existing coal bins are replaced.  The primary ...
Read More

When Speed is of the Essence

Expertise when you need it most – and need it fast.   Industrial Ally recently completed three structural engineering projects that demanded accelerated schedules.  The first project involved fast track design ...
Read More

Making Client Facilities Safer

Industrial Ally has successfully completed an Arc Flash mitigation program encompassing nine cement terminals in the continental US. Utilizing existing one-lines and field data, we modeled the existing plant distribution ...
Read More

Industrial Ally has completed a study for the installation of a modular vertical roller mill (VRM) system to produce Type IP and Class N Pozzolan cement. The study included: Process, ...
Read More

Another quality and safety improvement project engineering assignment completed. Industrial Ally has provided an economical engineered solution to our client for improvements to its limestone handling system.   The client’s existing ...
Read More

Industrial Ally has recently completed a feasibility study for the installation of a waste heat recovery (WHR) system at a cement plant.  The study is a key element of the ...
Read More

We recently engineered a project to dramatically streamline a client’s high efficiency separator rejects circuit. After modeling and analyzing existing conditions, it was clear that the high degree of congestion ...
Read More

Industrial Ally recently completed a large laser scanning project for a client in the southeast. Within one month of award, we delivered a comprehensive “point cloud”  of existing conditions from ...
Read More

Industrial Ally has recently completed detailed design efforts associated with the replacement of a deteriorating plant water system.  The design included the replacement and improvement of over 300 feet of ...
Read More